A modular structure is a prefabricated building composed of repeated sections called modules — three-dimensional chunks of building, typically 60 to 90 percent completed off-site in a factory, delivered to site, lifted in by crane, and joined by inter-module connections. Modules can stand side by side, end to end, or stacked into storeys, so a building is assembled rather than constructed. The idea's most radical monument is Nakagin Capsule Tower, Kisho Kurokawa's 1972 stack of 140 bolt-on living capsules in Tokyo — the world's first example of capsule architecture — while its everyday forms range from CLASP school buildings to hospital blocks and Antarctic research stations.

Type
Prefabricated building of repeated volumetric units
Era / Origin
Post-war prefab; capsule architecture from 1972
Primary Material
Steel, timber, or concrete module frames
Structural Function
Self-bearing boxes joined into a whole building

Overview

Because modules are built in a factory while foundations are prepared on site, overall schedules shorten dramatically: a module may take ten days to three months to build, and placement on site only hours to days per unit. At Nakagin Capsule Tower, capsules fitted out 450 kilometres from Tokyo were attached at five to eight per day over thirty days, each bolted with just four high-tension bolts so any unit could be removed independently. Modules must also be built stronger than site-built work — screwed and glued joints, and 8 to 10 percent more lumber than conventional housing — simply to survive transport; after Hurricane Andrew in 1992, a FEMA study found modular and masonry homes had fared best among the construction types studied.

The type is distinct from the mobile home it resembles: modular buildings follow ordinary local building codes, sit on perimeter foundations rather than a wheeled chassis, and are financed like site-built houses. Its failure modes are instructive too — Nakagin's capsules were designed for replacement every 25 years, but none was ever exchanged and demolition began in April 2022, with 23 capsules preserved for museums; in Britain, ilke Homes entered administration in 2023 and L&G Modular halted production the same year.

Core Characteristics

Notable Examples

Architectural Connections

Influence and Legacy

Related Concepts & Techniques

Module (design unit), Prefabricated Structure (parent technique), Modular Design (design method), Structure (assembled whole), Frame (support system), Steel Construction (technique), Residential (typology)

Sources